Investment tunnel

Investment tunnel

The investor for this tunnel will be given an exclusive sale of the materials and needs of the entire region before the start of the expected investment period of 5 years

- The purpose of the project is to secure a tunnel for cars to enter the surrounding buildings through Basement 2.

- In addition to securing a return on investment by investing in Basement 1, commercial and investment businesses basement 3 + 4 as parking garage.

- In addition to obtaining a surface area of the garden to invest in removable materials (the principle of dismantling and installation) at 15% of the garden area.

- Garage width 48m

Garage length is 480m

Number of floors 4

The floor area is 23040 m2

Total area 92160 m2